top of page
PAINTING
The painting cycle takes place in a continuous process. The details to be painted are hung on the transport chain in order to meet all the steps foreseen in the proper times in their path. After being hung the particulars are subjected to degreasing, phosphating, rinsing and passivation with 50 ° water jets and then dried with hot air jets at 130 ° in the drying oven. Application of powder coatings is carried out with the new “SuperCube + Color Center” cabin.
The process continues in the baking ovens and after finishing the threads and let them cool down, checked, the pieces are removed fromthe transport chain, mounted and packed.




1/6
GALLERY
bottom of page